Offline survey & quoting · iOS & Android

Measure the room.Send the quote. Win the job.

BlueprintBuddy turns a wall-by-wall survey into branded floor plans, elevations and VAT-ready quotes — built right there on site, on your phone, with no signal required.

Free to download No per-plan fees Works fully offline
BlueprintBuddy floor plan app on a phone, previewing a scaled room plan with dimensions, a totals panel and PDF, PNG and CAD export buttons.
The before & after

A scribbled floor plan doesn't
win the work. A clean one does.

Same ten-minute site visit. The difference is what lands in your customer's inbox afterwards.

On the back of a notebook door 4.2m ? 3.1-ish 2.95 redo bay window! Mrs Whitman - lounge
Sent to the client A clean, scaled floor plan in BlueprintBuddy with dimension lines and room totals.
The workflow

Four steps from doorway to deal

01

Measure wall by wall

Tap to add each wall and type the length. The plan builds itself as you move round the room.

02

Add doors & features

Drop in windows, doors, and structural, electrical, ceiling and plumbing items exactly where they belong.

03

Build the VAT quote

Itemise the job with your own rates. Subtotals and 20% VAT are worked out for you, line by line.

04

Export & send

Branded PDF or image, ready to email before you've packed the tape measure away.

Watch it work

The full survey, start to finish

Around ninety seconds from an empty room to a finished, branded quote — see exactly how the survey comes together.

Survey · plan · elevations · quote

What's inside

One app for the whole survey

Measuring, plans, elevations and quoting — joined up, instead of four tools and a calculator.

Wall-by-wall measurement

Precise, manual control over every wall — you type the exact figure, so there's no estimating and no drift.

Plans & elevations

Generate a true scaled floor plan and wall elevations from the very same survey — no redrawing.

VAT-ready quotes

Itemised quotes with your rates and 20% VAT totted up automatically, in clean GBP your customer trusts.

Branded exports

Your logo and business details on professional PDFs and images, ready to share straight from your phone.

Works fully offline

Lofts, basements, new builds with no signal — everything runs on the device, nothing waits on a connection.

Built for UK trades

Metric by default, standard UK door and ceiling sizes, GBP and VAT — set up the way you actually work.

Manual vs AR scanning

Why a tape beats a phone sweep

AR scanners are clever in a clean, well-lit empty room. On a real job, control and precision win.

Capability
BlueprintBuddy
AR room scanners
Works with no signal
Fully offline
–Often needs the cloud
Precision you control
Exact, typed figures
–Estimated from a sweep
Wall elevations
Plan & elevations
–Usually plan only
Quoting built in
VAT quotes included
–Measure only, quote elsewhere
Per-plan fees
None
–Common on exports
The output

The document your customer sees

Every survey ends in something you'd be glad to put your name on.

A branded BlueprintBuddy quotation document: reference Q-001, scope of works, subtotal £1,791.70, VAT at 20% of £358.34, total £2,150.04, payment terms and a signature line for acceptance.

Plan, elevations & quote — every document generated from a single survey.

Who it's for

Made for the people on site

Surveyors Estimators Flooring contractors Painters & decorators Builders Electricians Plumbers
Good to know

Questions, answered

Does it really work with no signal?
Yes. Measuring, plans, elevations and quotes all run on your phone, so a basement, a loft or a new build with no reception is no problem. Nothing waits on a connection to upload or process.
Where is my customers' information stored?
On your device. BlueprintBuddy doesn't upload your surveys or customer details to a server, which keeps you firmly in control of your data. See the privacy policy for the detail.
What does it cost?
BlueprintBuddy is free to download and free to use. Premium features are unlocked with a BlueprintBuddy Pro subscription — £2.99 a month or £14.99 a year — bought through Google Play or the Apple App Store. There are no per-plan fees on your exports.
Which devices does it run on?
Android phones and tablets, plus iPhone and iPad — download free from Google Play or the Apple App Store.
What can I export?
Branded PDFs and images you can email straight away, plus vector formats (SVG and DXF) for carrying the drawing into CAD workflows.
Can I put my own branding on it?
Yes. Add your logo and business details and they'll appear on your floor plans and quotes, so everything that leaves your phone looks like it came from your firm.

Your next quote could go out
before you've left the drive.

Download BlueprintBuddy and turn your next site visit into a finished, branded quote.

Free to download · Pro from £2.99/month · Built for UK trades